C-8.2.1, r. 1 - Regulation respecting standards, specifications and quality criteria applicable to 9-1-1 emergency centres and to certain secondary emergency communication centres
7.The electrical power system of a centre must be tested every 3 months, with the electrical load of equipment necessary for its operations, to ensure that operations may in no case be interrupted.
7.The electrical power system of a centre must be tested every 3 months, with the electrical load of equipment necessary for its operations, to ensure that operations may in no case be interrupted.